Pond Sludge Prior to treatment
subsequent bioaugmentation to reduce the level of TPH to acceptable levels for the protection of human health and groundwater.
In addition to the pond sludge treatment, contaminated soils from the remainder of the site were also treated by ex-situ bioremediation.
Contamination levels within the sludge prior to treatment were in excess of 75,000mg/kg. Levels following treatment had recued to less than 2000mg/kg. treatment. The treatment took approximately 16 weeks from commencement to achieving the remedial target concentrations.
Soil samples from the treated materials were collected at regular intervals and sent
to an independent lab for testing. The testing requirements were tailored to the identified contaminants of concern, namely Speciated TPH.
The works were permitted by the deployment of a Mobile Treatment License.

Initial treatment of pond sludge
The works were independently supervised and validated by the developers environmental consultants.
Provision of Environmental Consultancy

In addition GEMCO assisted in identifying the most cost effective permitting route to enable the importation of soils for clean capping of site.
GEMCO use the services of fully accredited laboratories.

Pond sludge after treatment